"Good news! Testing has confirmed that the design changes solved the sensitivity issue. Better yet, we've exceeded our target numbers by 6dBm on both AM and FM!
The manufacturing process will begin this week. Our manufacturing team will evaluate the new design and provide a schedule (which we'll post). The manufacturing process typically takes 10 to 12 weeks.
We expect backorder delivery to begin in late Q2. Orders placed today will be an additional 4 to 6 weeks from our first ship date.
Status updates are posted weekly or as new information becomes available.
The Radiosophy Team"
http://www.radiosophy.com/status/
Just wondering...how much difference will 6 dBm make? Does anybody even know what their goal (for sensitivity) was?
Thanks,
JM
<P ID="signature">______________
16-year-old radio geek.</P>
The manufacturing process will begin this week. Our manufacturing team will evaluate the new design and provide a schedule (which we'll post). The manufacturing process typically takes 10 to 12 weeks.
We expect backorder delivery to begin in late Q2. Orders placed today will be an additional 4 to 6 weeks from our first ship date.
Status updates are posted weekly or as new information becomes available.
The Radiosophy Team"
http://www.radiosophy.com/status/
Just wondering...how much difference will 6 dBm make? Does anybody even know what their goal (for sensitivity) was?
Thanks,
JM