Jim A, three guesses, two don't count. To the DJ, I would not move the site. other than a tower being a little off, That site is good. Conductivity there is better than most places in Wilson County. It would take some work, but that site was chosen for a reason. I wold, however cut the trees and pull all the roots, move that tower and re-lay the ground system. I wold call Stu Graham, and have Kintronic make a new phasor and ATU's. I
would check with Stu to see if more power could be had.Even if it is 1-2 kw more it would be worth the effort. even with everything as it is now, before power was removed I did a test. With 5 amps common point, day pattern, the station was readable in Morehead City. That is about 120 miles as the crow flys. It was not pretty, but it was there