KFXR 1190 has filed an engineering STA to operate at night with 5kw from its day site, due to transmitter repair issues at the night site. From the filing:
“We are unable to quickly source parts needed to repair the transmitter for the night site. We are operating the day site with power reduced to 5 kw until repairs can be made.”
Maybe it’s my suspicious mind at work, but I have to wonder if iHeart might be considering shutting down the 1190 night site near Rockwall and re-engineering the centrally located day site for night operation? This could be a test of that.
“We are unable to quickly source parts needed to repair the transmitter for the night site. We are operating the day site with power reduced to 5 kw until repairs can be made.”
Maybe it’s my suspicious mind at work, but I have to wonder if iHeart might be considering shutting down the 1190 night site near Rockwall and re-engineering the centrally located day site for night operation? This could be a test of that.
