A hypothetical station has a CP to upgrade their facility.
Either the new transmitter has been installed but not the new antenna or visa versa.
The old and new equipment can not both fit within the limited space and the station wishes to avoid down time.
Does the CP allow the station to run normal programming at an intermediate signal level, or is special temporary approval necessary?