Posted today is applications are technical updates for KJET and KLSY. The proposed tower-for-use is slightly northeast of the currently listed sites. This gives a little more coverage over Seattle proper but because of the lower HAAT the power needed will jump from 33 kw ERP to 40 kw ERP.
Here's the summary from the engineering study:
" Combined operation of KJET, KLSY, and KDDS-aux is proposed with a 6-element circularly-polarized
directional panel antenna system. The antenna will be side-mounted on an existing tower
located atop North Mountain, in the space currently occupied by the KDDS auxiliary antenna
BXMLH-20081014ACE."
Now if only KRXY could move up there and "quadplex"..
Here's the summary from the engineering study:
" Combined operation of KJET, KLSY, and KDDS-aux is proposed with a 6-element circularly-polarized
directional panel antenna system. The antenna will be side-mounted on an existing tower
located atop North Mountain, in the space currently occupied by the KDDS auxiliary antenna
BXMLH-20081014ACE."
Now if only KRXY could move up there and "quadplex"..