I'll waste a weekend on something which failed, assuming it was properly maintained. However, if the plant overtemps because of lack of maintenance to the HVAC system, or lack of capacity, I'll have my "Weekend" price to go mess with it. Lack of action on the part of the owner ain't gonna constitute an emergency on my part.
Just like studios, whatever the calculated load is, we double it, and then stage that amount of cooling. Coils are cleaned annually, machines are inspected on contract quarterly. We don't loce airtime to overheating. Since the systems are staged, they don't hit you in the pocket too hard on non-roasting dasys.