Allfirdup said:actually didn't have to dig deep at all, the application to share facilities with WVKO was filed 2/12/2007, WVKO its self didn't have permission for the site until fall
gabigley1 said:It looks to me like the FCC is making it very clear that they must get back on the air by May 5, 2007.
See this article below about their app. for a building permit:
http://www.thisweeknews.com/?sec=ho...020107/Northland/News/020107-News-297578.html
gabigley1 said:Even though the FCC granted WVKO an S.T.A. to broadcast N.D. at reduced power with one tower, they still may not be able to meet the F.C.C. May 5th deadline to get back on the air because they are still waiting on a building permit for the transmitter building. That usually takes 60-90 days??
markbohach said:A 250 Watt solid state transmitter and processing can fit in a small roadcase. To get on the air, a building is not really necessary. I once saw a 20KW FM transmitter running inside of a semi-trailer to meet the expiration date of a construction permit. A small panel truck would get the job done.
As far as programming the station- how big is an I-Pod Nano?
gabigley1 said:This email is from Ms. Shannon Pine of the City of Columbus Zoning Office. Dose anyone know why
WVKO would only requested 4 towers for the rezoning change when the application and C.P. shows they will utilize 6 towers for for both day and night operation?? Could the other two towers be for future plans?? Maybe WVKO thought that they could only get 4 towers approved for rezoning.
markbohach said:A 250 Watt solid state transmitter and processing can fit in a small roadcase. To get on the air, a building is not really necessary. I once saw a 20KW FM transmitter running inside of a semi-trailer to meet the expiration date of a construction permit. A small panel truck would get the job done.
As far as programming the station- how big is an I-Pod Nano?
gabigley1 said:Well, I got lucky and caught the WVKO Chief Engineer last night...... He told me that he expects to be back on the air with about 200 watts(one tower) N.D. by the end of April and have the entire four tower site in operation by the end of this Summer. They will be operating with a S.T.A. until then.
rcray said:I was by the transmitter site again today. Looks like they had a accident there was a crane putting up the second tower looks like something slipped anthe tower came down and bent in half ruining a couple of the 15 foot sections.