Client station discovered their tower wasn't where they thought. 7 seconds off.
Registered in 1997 but owners didn't tranfer the registration (noted as wrong place.)
FCC claims it will not authorize ANY operation of registration is not correct. FAA indicates new Air Haz determination is needed.
Tower transfers owners 3 times and most recently to a new owner. Registration still 7 seconds off.
Can the station operate legally at a site with an incorrect registration? has theis scenario played out before?
Registered in 1997 but owners didn't tranfer the registration (noted as wrong place.)
FCC claims it will not authorize ANY operation of registration is not correct. FAA indicates new Air Haz determination is needed.
Tower transfers owners 3 times and most recently to a new owner. Registration still 7 seconds off.
Can the station operate legally at a site with an incorrect registration? has theis scenario played out before?