Witchlover said:What's the lag time between when something is filed on M Street and the time it is posted on line for public access, does anyone have any idea?
Day or two at the most. The FCC has gotten much better at updating their database. I filed for program test on a directional FM I built, two days later the approval was in the database and I made a beeline to the transmitter site to crank up the power!